My project is about building and testing facility that simulate the jet engine environment inside a test chamber and this testing facility has the capability to simulate high-temperature, high-pressure, high-speed flow, steam environment, and load and stresses, and thermal gradients. All sorts of things that happens inside a jet engine and we plan to test materials inside the test chamber. We've reached our final stage of integration in the project and we've received the equipment behind me in May of 2017 and it was supposed to be around 4,000 pounds. It turns out it was around 7,000 pounds when it got here and we were worried that he might end up damaging the floor and we might be overloading the floor because this lab is not really a mechanical room it's build for laboratories work. So we had to make sure it's going to be safe to bring all these equipment inside and install them together. So we had to first go to the structural engineer in the university and describe what happened, and he had to run calculations to see if it's safe or not and then he recommended that we should have a two feet clearance around the equipment and put no more loading on the floor so it would be safer. But because of this event, there were other problems that happen with the other schedule work afterwards, so we pretty much had to make a new project plan and then we had to negotiate with all the other vendors to postpone their work without incurring more charges. And we had to get together with the rigors and the construction crew to plan new setup work that we could do to finish, go towards the finish line of the project